How to use the NWAS EPRR Evidence Module
The following is an abbreviated version of the module information, which you can access at any time by clicking the ‘i’ symbol in the top right hand corner.
1. Enter Your Details:
- Select your role.
- Upload your Job Contract or Contract Variation Letter (including issue date).
- Choose your region (select Resilience if you are a NILO or Loggist).
2. Determine NOS:
- Your role will determine the required National Occupational Standards (NOS).
- Add at least two optional NOS (one if you are a Loggist).
3. View NOS Overview:
- This page shows your NOS compliance levels:
- Red: Not compliant
- Amber: Partially compliant
- Green: Fully compliant
- Initially, all levels will be red. Click on a NOS to view compliance details and related PCKUs. Use ‘Back’ to return.
4. Add Evidence:
- Click “Add new evidence” or the blue ‘+’ button and select EPRR Evidence.
- Choose the relevant NOS and PCKUs. You can select multiple.
- Add CPD information, including METHANE, and JESIP details. The form saves drafts for later editing.
5. Review Evidence:
- Find your evidence listed at the bottom of the page.
- Export your evidence as a .pdf.